Florida Sealcoat & Striping LLC
Florida Sealcoat and Striping crew laying fresh asphalt with a paver on a commercial paving job in Southwest Florida

COMMERCIAL ASPHALT PAVING · LEE COUNTY, FL

Asphalt Paving Fort Myers.

From the River District to Edison Mall.

Seventeen years paving Fort Myers HOAs, retail centers, medical complexes, and industrial properties. Built right. Built for SWFL conditions.

LICENSED CBC 1266325 · LEE COUNTY · 17+ YEARS · BUILT TO LAST

TRUSTED BY

Request a Fort Myers paving quote

FORT MYERS ASPHALT PAVING

Fort Myers paving done right. Trusted by SWFL property managers since 2007.

Commercial asphalt paving requires the right base, the right depth specification, the right materials, and the right execution. After 17 years paving Fort Myers commercial properties — HOAs, retail centers, healthcare facilities, and industrial sites — Florida Sealcoat & Striping has earned the trust of property managers and boards across the region.

Fort Myers commercial paving spans diverse property types. Retail corridor parking lot replacements handle daily traffic and tenant operations. Healthcare facility paving requires emergency vehicle access throughout the project. Master-planned community road networks need phased work that maintains resident access. Industrial site paving handles heavy truck traffic specifications. Florida Sealcoat & Striping has executed all of these paving types across Fort Myers and calibrates each project to the property type.

Fort Myers commercial paving scheduling adapts to the property. Retail centers typically choose phased weekend work or section-by-section execution. HOA communities prefer scheduled weekday work with resident communication packages. Healthcare facilities schedule around patient access requirements with emergency routes preserved. Industrial sites often allow daytime work with operational coordination. The right schedule comes from the proposal conversation, not a contractor default.

Fort Myers commercial paving requires specifications calibrated to actual property conditions. Asphalt depth specifications account for actual traffic loads on each property — retail delivery vehicles, garbage trucks, emergency vehicles, and resident traffic all factor into specification decisions. Base preparation accounts for site-specific drainage and subgrade conditions. Material selection accounts for SWFL UV exposure, summer rain cycles, and traffic intensity. Proposals include detailed specifications for each property's actual conditions, not generic Fort Myers assumptions.

17+
YEARS PAVING FORT MYERS
Built to
SWFL CONDITIONS
Licensed
FLORIDA CERTIFIED BUILDING CONTRACTOR

OUR PROCESS

How we pave a Fort Myers parking lot. Right.

Seven steps. Every Fort Myers paving project. Same standard.

01

Site walk and condition assessment.

We walk the Fort Myers property with you. Existing pavement condition documented. Drainage assessed. Subgrade conditions evaluated where exposed. Scope documented in writing before quoting. Photo documentation included with assessment.

02

Specification and proposal.

Asphalt depth specified for the property's actual traffic load. Base preparation requirements documented. Materials specified (FDOT-approved mixes for commercial work). Line-item proposal delivered for property manager or board review. Specifications calibrated to property type and conditions.

03

Permits and scheduling coordination.

Lee County and Fort Myers permits obtained where required. Project scheduled around weather windows and property operations. Resident or tenant communication packages prepared. Equipment delivery coordinated. Traffic control planning where required by site.

04

Site preparation and demolition.

Existing asphalt milled or demolished as specified. Sub-base inspection and correction. Drainage issues addressed. Site graded for proper water management. Areas requiring base correction documented for separate scope if not already included.

05

Base preparation.

Crushed stone aggregate base placed and compacted to specification. Density testing where required. Base depth verified before asphalt placement. Edges shaped for clean transitions to surrounding pavement or curbing.

06

Asphalt placement and compaction.

Asphalt placed by professional paving equipment. Hot mix maintained at proper temperature. Compaction with appropriate rollers per specification. Pass count verified for proper density. Surface smoothness verified during placement.

07

Final inspection and documentation.

Walkthrough with property manager. Surface inspection across the entire paved area. Photo documentation of completed work. Compaction documentation provided. Warranty paperwork delivered. Recommended maintenance schedule provided in writing.

RECENT PAVING WORK

Paving across Southwest Florida.

Florida Sealcoat and Striping crew laying fresh asphalt with a paver during a commercial paving job in Southwest FloridaCOMMERCIAL · PAVING

SWFL · PAVING

Commercial asphalt paving with a fresh full-depth surface laid by our paving crew.

Fresh asphalt paving work at a CVS Pharmacy storefront in Southwest Florida by Florida Sealcoat and StripingRETAIL PHARMACY · PAVING

SWFL · PAVING

Retail pharmacy asphalt paving and surface repair at a CVS Pharmacy location, completed with minimal disruption to store access.

Roller compacting fresh asphalt at the MINI of Fort Myers auto dealership in Fort Myers Florida by Florida Sealcoat and StripingAUTO DEALERSHIP · PAVING

FORT MYERS, FL · PAVING

Auto dealership asphalt paving with a roller compacting a fresh surface at MINI of Fort Myers.

SERVICE AREA WITHIN FORT MYERS

Paving commercial properties across Fort Myers and Lee County.

MAJOR COMMERCIAL CORRIDORS

  • Cleveland Avenue (US-41)
  • Colonial Boulevard
  • Daniels Parkway
  • Metro Parkway
  • McGregor Boulevard
  • Tamiami Trail

FORT MYERS AREAS

  • Downtown / River District
  • South Fort Myers
  • North Fort Myers
  • Gateway
  • Fort Myers Beach
  • Iona / McGregor

PAVING TYPES WE EXECUTE

  • HOA community road networks
  • Retail plaza repaving
  • Medical complex parking
  • Industrial site paving
  • Office complex repaving
  • Parking lot expansion

INDUSTRIES WE COMMONLY SERVE

Any commercial property. Six industries we pave most often.

We pave any commercial property in Fort Myers — from corporate campuses to corner gas stations, from condominium associations to industrial yards. These are the six verticals we serve most often, each with specific paving considerations we've learned to handle over 17 years.

Communities & HOAs

Master-planned communities, gated developments, and condominium associations across Fort Myers, Gateway, and South Fort Myers. Community road network repaving, parking lot replacement, capital project execution. Board approvals, resident communication, phased execution that maintains community access throughout the project.

Retail Centers & Plazas

Shopping plazas, big-box retailers, outparcel pads, and restaurant pads across the Cleveland Avenue retail corridor and beyond. Parking lot resurfacing, full repaves, and parking lot expansion projects. Phased execution to maintain tenant operations during projects.

Medical Facilities & Healthcare

Medical office complexes, urgent care, dental and specialty practices, and Lee Health network medical facilities. ADA access maintained throughout paving projects. Emergency vehicle routing preserved. Patient drop-off zones coordinated with facility management.

Industrial & Distribution

Warehouses, distribution centers, and manufacturing facilities. Heavy traffic load paving specifications. Truck access road repaving. Asphalt depths calibrated to actual vehicle weights and turning loads.

Office Complexes & Corporate Parks

Professional buildings, corporate campuses, and multi-tenant office complexes across Fort Myers. Multi-tenant coordination through property management for parking logistics during repaving projects.

Religious & Educational Facilities

Churches, schools, daycares, and educational facilities. Service-time scheduling. Summer break scheduling for educational facilities. Drop-off and pick-up traffic patterns considered.

DON'T SEE YOUR INDUSTRY?

We pave any commercial property in Fort Myers.

Restaurants, gas stations, auto dealerships, self-storage facilities, government buildings, marinas — if it has commercial asphalt in Fort Myers that needs paving or resurfacing, we do it. The six industries above are where we have the most experience, but the same standards apply to every project we take.

Get a paving quote for your property →
"

Highly recommend. As a business owner myself they provided professional service with constant communication to upgrade our parking lot for our property.

Justin Green, Business Owner

FORT MYERS PAVING QUESTIONS

Common questions about commercial paving in Fort Myers.

Fort Myers commercial paving is priced by square footage, asphalt depth specification, base preparation requirements, and project complexity. A retail plaza parking lot resurfacing has different pricing than a community road network with multiple sections. We provide line-item quotes for every Fort Myers project: scope per section, total square footage, asphalt depth and material specifications, base preparation, and any drainage corrections required. Quotes delivered within 48 hours of a site visit.

Full paving is a complete pavement replacement including demolition of existing asphalt, base preparation or correction, and new asphalt placement. Resurfacing places new asphalt over existing pavement after surface preparation (typically 1 to 2 inches of new asphalt). Overlay is a thinner application over existing pavement, typically used to refresh surfaces without addressing structural issues. The right approach depends on existing pavement condition, traffic loads, and budget. We document the recommended approach during the site evaluation.

Yes. Fort Myers has significant HOA presence in Gateway and surrounding master-planned communities. HOA road network paving requires phased execution that maintains resident access throughout multi-week projects. Board-ready proposals with line-item pricing per section, capital reserve documentation, resident communication packages, and references from comparable community paving projects are all standard with every Fort Myers HOA paving proposal.

Fort Myers healthcare facility paving carries operational stakes other commercial paving doesn't. Medical complexes require emergency vehicle access maintained throughout the project — ambulance access, fire department routing, and patient drop-off zones cannot be blocked. Most healthcare paving is phased section-by-section with detailed traffic control planning. ADA-compliant accessibility maintained during the project, not just at completion. Patient parking continuity is coordinated with facility management throughout. We've paved Fort Myers medical complexes for over a decade and built our healthcare project planning around these requirements.

Project timing depends on scope. A single retail parking lot resurfacing typically completes in 3 to 7 days. Multi-section HOA community road network projects may take 4 to 8 weeks with phased execution. Industrial facility repaves often complete on weekends or scheduled shutdowns. Weather, permits, and site conditions can affect timelines. Realistic timing documented in every Fort Myers proposal.

Yes. The Cleveland Avenue (US-41) retail corridor and Colonial Boulevard are core to our Fort Myers work. Retail corridor paving requires tenant operations coordination, phased execution that keeps storefronts accessible, and weekend or overnight work where daytime closures aren't feasible. Traffic control planning for high-volume corridors is built into every proposal.

Yes. Florida Sealcoat & Striping LLC holds Florida Certified Building Contractor license CBC 1266325, which covers all commercial paving work in Lee County including Fort Myers. We carry full general liability insurance and workers compensation coverage. License and insurance documentation provided before every project begins. Fort Myers and Lee County permits handled as part of the project scope.

Most Fort Myers commercial paving happens phased to keep portions of the facility operational during work. Retail centers typically close one section at a time or schedule weekend work. HOA communities complete one section at a time so residents maintain access. Healthcare facilities phase work with emergency routes preserved throughout. Industrial sites often pave during planned shutdowns or weekends. Schedule is calibrated to property operations during the proposal phase. Most properties do not need to fully close during paving projects.

NEARBY SWFL CITIES

Paving across Southwest Florida.

Same standards. Six cities across SWFL.

READY FOR YOUR FORT MYERS PAVING QUOTE?

Get your free Fort Myers paving quote.

24/7 quote requests. Response within 24 hours.

Or call us 24/7: (239) 946-5398